In 2024, we installed a solar power system for Park Hotel Delta to serve its hospitality facility, with the goal of reducing energy consumption and improving the hotel’s operational sustainability.
The system, with an installed capacity of 154.80 kWp, is expected to generate an average annual output of approximately 154.8 MWh, contributing significantly to the facility’s self-generated energy.
The project was developed as a turnkey solution, with us handling every phase—from design to installation and commissioning—ensuring an efficient implementation with no disruption to the hotel’s normal operations.
This project combines energy efficiency and sustainability, enhancing the property’s value from both an environmental and economic perspective.

Contact us for more information and a free quote.